Waste incinerators | Tenderlake

Waste incinerators

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
01 February 2023
Closing Date:
03 April 2023
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
Replacement electrostatic precipitator line 1

The existing line 1 electrostatic precipitator has clearly exceeded the expected service life of 25 - 30 years. Also, its dust separation no longer corresponds to the current state of the art. The increased dust content results in a problem of contamination in the downstream units, in particular the flue gas heat exchangers.

The line 1 electrostatic precipitator is therefore to be replaced as part of the overall project "Performance enhancement and optimisation of the Trimmis waste incineration plant".

The existing line 1 electrostatic precipitator has clearly exceeded the expected service life of 25 - 30 years. Also, its dust separation no longer corresponds to the current state of the art. The increased dust content results in a problem of contamination in the downstream units, in particular the flue gas heat exchangers.

The line 1 electrostatic precipitator is therefore to be replaced as part of the overall project "Performance enhancement and optimisation of the Trimmis waste incineration plant".

Download full details as .pdf
The Buyer:
Nutec Engineering AG
CPV Code(s):
42320000 - Waste incinerators
42514200 - Electrostatic air and gas cleaners