The market town of Kösching is planning the new construction of the Kösching school.
Construction phase 1 includes the after-school care centre and the primary school with HPT.
The school building consists of the ground floor and 2 upper floors, it has a partial basement.
Gebäudelänge: 52,6 m
Gebäudetiefe: 23,3 m
Building height: 12.55 m
The roof is a pent roof made of reinforced concrete with a 5% slope.
New construction of after-school care + primary school with HPT
School building E+2, partial basement
Gebäudelänge: 52,6 m
Gebäudetiefe: 23,3 m
Building height: 12.55 m
Monopitch roof made of reinforced concrete, with 5% slope
masses:
1,020 m² reinforced concrete floor slab, d=60 cm
3,700 m² reinforced concrete floor slabs, d approx. 25-30 cm
320 m² Kellerumfassungswände, d=30 cm, wu-Beton
1,200 m² reinforced concrete exterior walls, d=25-30 cm
1,100 m² fair-faced concrete interior walls
400 m² Ziegelwände, d=24 cm