Workshops for disabled people (phase 2) in Limpach
HVAC and sanitary installation work for a functional building / workshop.
2 gas condensing boilers, 1 heat pump, 1 heat pump, 70 radiators, 60 floor convectors, 4500 m of insulated pipes, hydraulic network equipment set, 10 double flow ventilation units, 1 500 m of round sheathing, 3000 m 2 rectangular sheathing, 100 m 2 , ventilated ceiling for kitchen, thermal insulation of cladding, equipment set and diffusers for 4000 m aerothermal networks, cold and hot water distribution, thermal insulation of pipelines 400 m, waste water and rainwater evacuations in cast iron and PE pipes , 1 EU treatment plants, 10 producers of instantaneous hot water 230 V and 400 V, good quality sanitary equipment with faucets including: 40 WCs, 15 urinals, 80 sinks, 7 washbasins for the disabled, 7 toilets for the handicapped, stainless steel sanitary fixture kits, fire extinguisher fire protection, 1 DDC control unit for automatic temperature and energy management, cabinets and electrical connections for all equipment.