Structural and demolition work 3.
Demolition work gutting
- approx. 12m³ masonry demolition, partly load-bearing
- Break off approx. 300 m² suspended ceiling
- approx. 200 m² screed demolition, partly with tiles, partly floor coverings
- approx. 330 m² demolition of drywall and facing shells
- Approx. 36 pcs remove doors
- Built-in furniture, loose furniture
- Deckenversorgungseinheiten
Bricklaying
- approx. 9 m³ of masonry work in small quantities within the building
- Making openings, closing, etc.
Steel construction work
- approx. 0.6 t of steel construction work for interception structures
Protective measures
- approx. 570 m² of dust protection measures of various kinds