HWS sheet piling, production of new dike chart V0240/2021 Bremen-Blumenthal
Construction of a HWS sheet piling, construction of 2 types of dikes (chisel gate) and piping and shaft construction work, strengthening of the ladle.
Main activities: Preparing the construction site, Technical processing, clearing of construction site, approx. 850 m3 of floor excavation, sheet sheet monitoring, approx. 11 500 m2 sheet structure, approx. 150 pieces of round steel anchors, approx. 80 microwall piles, approx. 830 m steel belt, approx. 1 900 m sheet piling, 1 100 m2 . Decoating of existing sheet piling, 7 800 m2 coating new HWS wall, 1 100 m2 coating existing wall, 3 650 m3 installation of a mineral filter layer for deckwork, 4 100 m3 bulk block block with partial and full encapsulation in small quantities, construction of 2 types of dike clearances made of reinforced concrete with steel components, new construction of a stainless steel estuary up to DN 1,200 including equipment (slider, check valve), refurbishment of a ladle including the increase of the HWS wall and adjustment of the inspection caps.