Planning services (LPH 1‐8) for the construction of electrotechnical systems – MV‐Schalthaus Waldäcker 3 in Ludwigsburg
as an extension of a nearby substation
Planning services (LPH 1‐8) for the construction of electrotechnical systems – MV‐Schalthaus Waldäcker 3 in Ludwigsburg
as an extension of a nearby substation.
The task of the Contractor is to provide the planning service/service for:
• MV switchgear with protective devices,
• Battery supported power supply,
• Telecontrol system with integration into the SWLB system,
• tendering of the installations and supervision of the companies during execution,
• Assistance with the acceptance of the system and approval of payments.