The subject of this contract is the construction of the first part of the storage facility (20 modules), including technical equipment such as overhead cranes, railway transport and infrastructure, electrical equipment and control and control equipment. The storage facility will perform long-term safety functions. The means to ensure this safety will be mainly implemented during the construction phase. Quality assurance and control are therefore an essential part of the market, as are documentation and risk analyses.
LOT 2: electromechanical (roualnt bridge, transport and railway infrastructure, electricity control command)
Republication of lot 2 following the absence of applications received at the time of the first publication