Cleaning of drainage facilities in the area of the Masters Weilerswist.
47-20-7043:
- approx. 60 gas test;
- approx. 22 hours removal of dangerous concentration;
- approx. 25 pcs. Inlet lock;
- Carry out approx. 15 hours of declaration analysis;
- approx. 145 hrs use of high-pressure flushing and suction vehicles;
- approx. 23 hours night use of high pressure flushing and vacuum trucks;
- approx. 44 St. removal of roots in drainage pipes;
- Removal of roots in drainage pipes approx. 24 hours at night;
- approx. 2,800 m camera inspection of drainage pipes;
- approx. 900 m camera inspection of drainage pipes at night;
- approx. 360 to. Dispose of waste;
- approx. 30 m
- approx. 3 psh. Set up construction site;
- Provide approx. 0.6 Mt. of construction site equipment;
- approx. 3 psh. Clear construction site facilities;
- approx. 3 psh. Set up lock and drain lock;
- approx. 3 psh. Establish a water retention system at the option of the contractor;
- Take approx. 3 water sample overflowed water * extraction device;
- approx. 6 pcs. Sample to client * bottle of the contractor;
- Take approx. 6 pieces of sample Sludge / sediment * Sampling device;
- approx. 3 psh. High-pressure flushing and vacuum truck use;
- approx. 3 psh. Clean rainwater retention basin;
- approx. 607 m