Demolition and construction of a new school building (elementary and middle school)
- Gross volume: approx. 25,000 m
- Gross floor area: approx. 5,800 m
New building as a passive house.
Trockenbauarbeiten
Walls:
- Partition walls, hard plasterboard, H 3.75 m, various fire protection and noise protection requirements: approx. 3,500 m
- Facing shells, H 3.75 m, plasterboard or hard plasterboard: approx. 450 m
- Shaft walls, H 3.75 m, plasterboard or hard plasterboard, with and without fire / noise protection requirements: approx. 250 m
- Inspection hatches, various dimensions, with and without fire protection requirements: approx. 60 pieces.
Cover:
- Suspended ceiling, plasterboard, single-layer: approx. 300 m
- Inserted ceilings, 300 x 1200 mm, mineral tiles: approx. 3,500 m
- Acoustic ceilings, perforated plasterboards, acoustic fleece: approx. 80 m
- Inspection hatches, various dimensions, with and without fire protection requirements: approx. 60 pieces