A 2022/35 Light rail programme Halle - Project 2.2, Mansfelder Straße West, traffic and civil engineering

Stadtbahn programme Halle (Saale), project 2.2 - Mansfelder Straße West,

Property ID: 10 10 15, Part of order 06.02.01 Transport and civil engineering

Fundamental expansion with route reorganization and extensive pipeline construction with:

track construction, catenary construction, traction power systems, stops, communication systems,

Road construction, street lighting, retaining walls, traffic safety, LSA systems,

Green areas, pipe and cable line construction, sewer works

Track construction:

- approx. 2000 m² track cover plates incl. base layers

- approx. 1400 m² asphalt pavement incl. base courses

- approx. 800 m² asphalt paving in the bridge area without base layers

- approx. 1200 m of track boards

- accommodate approx. 800 m² of green areas

- dismantle approx. 1200 m cross-sleeper track

- dismantle approx. 300 m block grooved rail track in the gauge channel with cast iron in the bridge area

- dismantle approx. 350 m track with cast iron

- dismantle approx. 200 m track construction (including control and actuator)

- produce approx. 1700 m drainage and connection pipes

- approx. 1000 m³ soil exchange and soil consolidation by means of lean concrete

- install approx. 3000 m³ of unbound base and frost protection layers

- install approx. 40 pcs of track and rail drainage boxes

- produce approx. 5000 m² concrete track support slab

- approx. 1900 m track installation, frame track, including welding and undercasting

- install approx. 200 m track construction on cast iron (including control and actuator)

- produce approx. 4200 m² asphalt surface, asphalt binder and asphalt base courses

- produce approx. 200 m² paving ceilings

- approx. 650 m Setting Borde

- create approx. 2200 m² green track area with substrate and turf

- create approx. 1000 m² of green areas

- 6 track changes with turnouts to be installed and removed during construction, including sidings

- Build stop equipment with standardized equipment elements for 1 new regular stop

road construction:

- milling and picking up approx. 5500 m² asphalt base and surface courses

- approx. 2500 m² of concrete base courses

- approx. 200 m² of paving and slabs incl. base layers

- approx. 300 m connect pipes for surface drainage

- install approx. 200 m drainage box gutter

- produce approx. 100 m retaining wall construction

- install approx. 50 pcs of road and bridge drains

- approx. 400 m³ soil exchange and soil consolidation by means of lean concrete

- install approx. 2500 m³ of unbound base and frost protection layers

- approx. 5000 m² asphalt base, binder and surface courses

- approx. 2000 m board and special boards

- approx. 4000 m² paving and slab ceiling, incl. guide plates for the blind

- create approx. 5000 m² of green areas

- Marking and signage

earthworks:

- approx. 5000 m³ excavation and earthmoving work

Abwasserkanalbau:

- approx. 1200 m of new construction and demolition, various nominal diameters, incl. shaft structures,

including insulation and rehabilitation, open and closed construction

Drinking water pipes:

- approx. 700 m of new construction and demolition, various nominal diameters

Interim drainage: manufacture and operation

Provision of planning services

- Create pipe statics, create excavation pit and shoring statics, design abutments

Medium, low voltage and FM

- Cable protection conduits (single and multiple pipes, cable trays): approx. 3000 m

- Kabel (NS, MS, FM): ca. 6200 m

- open and closed construction

gas pipelines

- Gas pipeline, different nominal diameters up to DN 300, high and low pressure, approx. 1000 m

- open and closed construction

Civil engineering services Trades traction current, communication, low voltage

- Cable conduits (single and multiple pipe): approx. 16000 m

- Cable ducts: approx. 30 pieces

- Foundation and connection work of the station equipment

Street lighting trade

Construction of a standard-compliant street lighting system incl. cabling and control cabinets

- approx. 60 top-mounted luminaires for new construction and dismantling

- approx. 57 poles for new construction and demolition

- Mount 4 pieces of light steles

- Kabelschutzrohre ca. 300 m

- Cable approx. 4000 m

- Kabelgräben ca. 2000 m

- temporary constructions

LSA-Tiefbau KP Mansfelder Straße / Holzplatz / Hafenstraße:

- New construction of the thermowell route, incl. approx. 100 m trench, approx. 300 m cable protection conduit,

approx. 5 mast pipe foundations and approx. 4 mast foundation foundations,

approx. 7 cable pull ducts, 1 piece cable distribution cabinet

F-LSA Mansfelder Straße / stop Saline:

- New construction of thermowell route, incl. approx. 30 m trench, approx. 100 m cable protection conduit,

2 cantilever masts with pipe foundation,

approx. 3 cable pull ducts, 3 cable and control cabinets,

Electrotechnical equipment

BÜ system:

- Dismantling of existing BÜ system

- New construction of BÜ system, including control unit with cabinet, software adaptation,

signalling devices and signal masts,

vorh. Cleaning the thermowell route, approx. 800 m,

vorh. Clean cable ducts, approx. 12 pieces

- New construction of thermowell route approx. 70 m, cable approx. 400 m,

produce 1 piece signal mast with pipe foundation,

1 Kabelziehschacht, 1 Steuerschrank,

electrotechnical equipment, signal transmitter approx. 10 pieces

Traffic safety:

- Traffic routing for 6 construction phases incl. multiple relocation and large-scale diversion via

the entire construction period (incl. barriers, guide elements, transportable protective device,

transportable LSA, temporary marking, diversion signage, adaptations to

existing LSA in the downstream network).

Download full details as .pdf
The Buyer:
Hallesche Verkehrs-Aktiengesellschaft
CPV Code(s):
45233120 - Road construction works
45234116 - Track construction works