This notice concerns an open call for tenders subject to the provisions of Articles R. 2124-1 and R. 2161-2 to R. 2161-5 of the French Public Procurement Code. The operation includes the construction of a reed-bed wastewater treatment plant, an outfall into the sea and the renovation of the related networks. This operation takes place within the right-of-way of the main base in Levant (Var). The works are divided into 3 lots: Lot 1 - Rehabilitation of the networks - Lot 2 - Construction of a wastewater treatment plant - Lot 3 - Rehabilitation of the outfall at sea. Lot 1 is divided into 3 sections (Articles R. 2113-4 to R. 2113-6 of the French Public Procurement Code) described under Lot 1 paragraph Ii.2.4). The overall lead time for the 3 batches is 28 months, including 9 months of preparation period (3 months for each of the 3 lots). The start date of the works is planned for the 1st quarter of 2024 (lot 1) and the 1st quarter of 2025 (lots 2 and 3)
Network Rehabilitation (2023-ESID-TLN-0653)construction of a wastewater treatment plant for the base camp of the main base of the Levant exclusively. The civil party (Heliopolis) is not concerned by the project.- construction of the wastewater treatment plant, - the repair of the sewerage networks and the separation of the wastewater/rainwater networks,- the rehabilitation of the autonomous or semi-collective sanitation systems - the rehabilitation of the outfall in the seaThe works of lot 1 - Repair of the networks are divided into 3 phases:- Firm tranche: Rehabilitation of the "Base Marine" upstream networks Part 1 - Optional tranche 1: Rehabilitation of the "Base Marine" upstream networks Part 2. - Optional Tranche 2: Rehabilitation of downstream networks and WWTP connection. There is a preparation period of 3 months, included in the overall contractual period:for the firm tranche: 10 months, for optional tranche 1: 7 months and for optional tranche 2: 2 months
Construction of a wastewater treatment plant (2023-ESID-TLN-0654)construction of a wastewater treatment plant for the base camp of the main base of the Levant exclusively. The civil party (Heliopolis) is not concerned by the project.- construction of the wastewater treatment plant, - the repair of the sewerage networks and the separation of the wastewater/rainwater networks,- the rehabilitation of the autonomous or semi-collective sanitation systems- the rehabilitation of the outfall into the sea. The works on Lot 2 - Construction of a wastewater treatment plant include a preparation period of 3 months, included in the overall execution period of 7 months
Rehabilitation of the marine outfall (2023-ESID-TLN-0655)construction of a wastewater treatment plant for the base camp of the main base of the Levant exclusively. The civil party (Heliopolis) is not concerned by the project.- construction of the wastewater treatment plant, - the repair of the sewerage networks and the separation of the wastewater/rainwater networks,- the rehabilitation of the autonomous or semi-collective sanitation systems- the rehabilitation of the outfall into the sea. The work on Lot 3 - Rehabilitation of the outfall at sea provides for a preparation period of 3 months, included in the overall work period of 6 months