— coating 3 water tanks and 2 aquarium tanks,
— coating system including preparatory work, priming spatula, sealing layer and sealing for floor surfaces 230 m
— hollow grooves in transition areas 175 m,
— sealing wall openings 59 pieces.
As part of a measure to expand the Multimar Wattforum in Tönning, Nationalpark-Service gGmbH is planning an otter outdoor area with the associated new building, aquariums and adventure exhibition, as well as animal enclosures and biotope design measures in outdoor areas.
The construction project is supported by a funding program and will be tendered and awarded in approximately 30 award units in accordance with VOB Part C.