Each lot will be allocated separately. The services are regulated by fixed prices. The project concerns the rehabilitation and energy renovation of the day school building - building 2.This building has 3 (three) levels:- ground floor, occupied by classrooms, administrative offices, and school life premises, on 1490 square meters Sdp about- r + 1, occupied by classrooms and premises school life, on 1780 square meters Sdp about - r + 2 partial for staff housing of about 252 square meters Sdp. This consultation is part of an operation of 10 lots broken down into two phases. The lots concerned by each phase are as follows:P hase 1: Lots 1, 2 and 10.Phase 2: Lots 3, 4, 5, 6, 7, 8 and 9.La this consultation concerns phase 2
Structuresite installations, punctual demolitions of paving (about 147 square meters), openings in load-bearing walls and floors, the implementation of traditional masonry in cinder blocks for modification of premises, the repair of dressed stone on the façade, the renovation of facades by thick lime plaster (about 4800 m2), adaptations and replacement of frame railings in facades
Roof framepunctual reinforcement of the existing framework and treatment (about 2100 square meters of frame - footprint of the building on the ground), revision of the roofs (about 2900 square meters), punctual modification for roof exits, replacement of gutters and downspouts Ep
Exterior wood furnishingsreplacement of exterior joinery (250 windows to be replaced, and 6 existing doors or windows to be retained), realization of fixed or risable brise soleil (about 39 U in total)
Inner state bodiesreplacement of door blocks according to the new layout of the transformed premises (about 40 U), realization of various furniture, replacement of all ceilings (about 2600 m2), realization of linings in wood wool or hemp lime plaster (3800 square meters in total), replacement of existing floors by linoleum floors (about 2575 m2), painting of all walls (about 4000 m2)
electricityelectrical distribution, replacement of all interior lighting, CFA distributions, pre-wiring - cfo (Vdi) and copper (telephony); the distributions Multimedia for educational use (Tv/Fm) and Teleinformation, intrusion, video protection and hours; terminal equipment Ssi/Sss of the day school from the central equipment set up by Lot 10
plumbing - heating - ventilation- Replacement of heating equipment and networks in building 2, installation of ventilation and fan installations in building 2 and partial repair of plumbing installations in building 2.- Replacement of heat production equipment in the central boiler room on the Alphonse Benoit high school site.- Installation of new control equipment for the boiler room and building 2 and implementation of a GTC with web interface
Outdoor Facilitiesearthworks, connection to the Eu/Ep sewerage networks and electricity networks, drinking water, public lighting, restructuring of the treated outdoor spaces: patio, west courtyard and south façade, on about 1730 square meters in total. Exterior requalification of the historic building consists of the dewaterproofing and revegetation of the central courtyard (900m2), the west courtyard (550m2) and the south façade (230m2)