The municipality of Hövelhof intends to build a new fire station for 9 parking spaces and a washing hall including the associated social and office rooms. The size of the building is approx. 10,500 cbm with approx. 2,300 sqm of usable space and is to be built in two successive construction phases BA (1.BA social wing 3-storey, 2.BA-hall area). Execution period approx. 1.BA CW14-2023 - CW34/2024, 2.BA CW38-2024 - CW 28/2025
Electrical work:
1 pcs HV with transducer measurement
1 pcs NSHV with automatic switching device for emergency power
5 St. Unterverteilungen
5 St. Datenschränke 19"
approx. 20,000m of various lines Cross sections
approx. 12,000m of data lines Types
approx. 400m Kabelbühnen
approx. 300m parapet duct with fixtures
approx. 14.000m Lehrrohr
approx. 100 sockets
approx. 370 pcs. Shine
1 St. Zentralbatteriegeräte Sicherheitsbeleuchtung
ca. 85 St. Sicherheitsleuchten
1 pc. charging station 22kW
1 St. Baustrom
1 St. Baubeleuchtung
1 satellite system