Cycle path construction work | Tenderlake

Cycle path construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 May 2023
Closing Date:
05 June 2023
Location(s):
BE31 Prov. Brabant Wallon (BE Belgium/BELGIQUE-BELGIË)
Description:
Direction des routes du Brabant Wallon Cyclostrade E411/N004 – PNRR project - Phase 1- Communes of Wavre and Ottignies-LLN – Section between Rue du Manil in Wavre and Bd de Wallonie in LLN

The purpose of this contract is the construction of a cyclostrade between Rue du Manil in Wavre and Rue de la Flèche in Ottignies Louvain-la-Neuve as well as the associated redevelopment work.

The purpose of this contract is the construction of a cyclostrade between Rue du Manil in Wavre and Rue de la Flèche in Ottignies Louvain-la-Neuve as well as the associated redevelopment work.

Specifically, the contract includes:

- The construction of a metal footbridge over the Rue du Manil and the associated abutments and ramps

- The creation of the cyclostrade on its own site between the rue du Manil and the chaussée de Namur ("firefighters") parallel to the motorway and the exit ramp

- The redevelopment of the Chaussée de Namur between the motorway ramp and the N4/N25 roundabout ("decathlon" roundabout) over its entire width in order to integrate the cyclostrade, as well as the redevelopment of the entrances/exits of shops.

- The redevelopment and widening of the N4 between the N4/N25 roundabout and Rue de la Flèche in the Wavre-LLN direction in order to integrate the cyclostrade

- The rehabilitation of the asphalt of the N4 between the roundabout N4/N25 and the rue de la Flèche in the direction LLN-Wavre, including two roundabouts

- The realization of landscaping (trees, various plantations) on the entire route

Download full details as .pdf
The Buyer:
SOFICO (Société Wallonne de Financement complémentaire des Infrastructures)
CPV Code(s):
45233162 - Cycle path construction work