The Lausitzbad Hoyerswerda was built in the 1990s as a family and leisure pool including an extensive sauna area. After 20 years of operation, the Lausitzbad Hoyerswerda is to be modernized and adapted to current user requirements and local needs. The realization takes place in a total of 6 construction phases.
• 1 piece of work and assembly planning
• 26 m galvanized and color-coated steel structure
• 12 pieces Aquacross modules (2x 6 pieces) course medium and easy
• 1 piece total motor with shaft and electrics and control panel
• 26 m maintenance system with bridge as banner carrier
• 1 piece maintenance contract for the first four years of operation