Connection of the interim containers to the existing buildings
Earthworks and pavingThe city of Neukirchen-Vluyn intends to set up interim containers as
Replacement measure for the construction period at the comprehensive school.
The MEP services described below include the connection of the interim containers to the existing systems.
The following systems are connected to the portfolio:
- Drinking water pipe
- Schmutzwasserleitung
- Power supply
- ELA system
- Networks EDP
SanitärarbeitenThe MEP services described below include the connection of the interim containers to the existing systems.
The following systems are connected to the portfolio:
- Drinking water pipe
- Schmutzwasserleitung
- Power supply
- ELA system
- Networks EDP
Electrical workThe MEP services described below include the connection of the interim containers to the existing systems.
The following systems are connected to the portfolio:
- Drinking water pipe
- Schmutzwasserleitung
- Power supply
- ELA system
- Networks EDP