Conversion and renovation of the existing women's clinic, extension with (emergency) cesarean section surgery and installation of additional delivery rooms,
Heating installation work according to DIN 18 380
Heating installation work in accordance with DIN 18380 • 2 heating manifolds to supply ventilation units, wall heaters and static heating surfaces including distributor structure and control fittings • approx. 800 m of steel pipe DN 15 — DN 80 welded • approx. 10 heating surfaces in tubular design • 2 connections to air conditioning units • thermal insulation work