Interior plastering, painting and varnishing work for the construction of a dormitory with 297
Residential units in 2 buildings.
Interior plastering, painting and wallpapering for the construction of a dormitory with 297
Residential units in 2 buildings.
In detail:
- approx. 3,000 m² interior plaster on STB walls as gypsum plaster or thin plaster,
- approx. 300 sqm interior plaster on STB walls as lime cement plaster,
- approx. 200 sqm ceiling plaster on STB ceilings as gypsum plaster,
- incl. All necessary preliminary work, attachments and terminations,
- approx. 28 000 m² dispersion coating of the walls on plasterboard or plaster surfaces,
- approx. 2,700 m² dispersion coating of the ceilings on plasterboard or plaster surfaces,
- painting on door frames and door leaves,
- Surface treatment of exposed concrete surfaces by means of hydration on stairs and columns.