The AOK Rhineland-Palatinate/Saarland - The health insurance fund tenders the supply with the implementation of winter service for a total of 31 locations.
Palatinate regionTasks and main areas of activity for internal and external traffic areas of the properties, which are part of the contractor's services:
1) Snow removal/removal
-Clearing of snow (black clearance) is required for internal and external traffic areas of the property (this includes, among other things: Underground car park entrance / exit, parking deck driveway / exit, sidewalks, sidewalks, driveways, paths to main, staff and emergency exits, accesses to hydrants).
-The formation of slippery conditions on traffic areas must be prevented and the usability of the areas must be maintained, as well as the drainage of snow water in the event of a thaw.
2) Sprinkle
3) Kontrollfahrten
4) Beobachtungspflicht
-The contractor ensures the ongoing observation of the objects and the weather situation (precipitation and temperature) during the winter service period.
- The maximum response time for winter service is 1 hour after the onset of snowfall or icy conditions until the on-site operation.
North Eifel areaTasks and main areas of activity for internal and external traffic areas of the properties, which are part of the contractor's services:
1) Snow removal/removal
-Clearing of snow (black clearance) is required for internal and external traffic areas of the property (this includes, among other things: Underground car park entrance / exit, parking deck driveway / exit, sidewalks, sidewalks, driveways, paths to main, staff and emergency exits, accesses to hydrants).
-The formation of slippery conditions on traffic areas must be prevented and the usability of the areas must be maintained, as well as the drainage of snow water in the event of a thaw.
2) Sprinkle
3) Kontrollfahrten
4) Beobachtungspflicht
-The contractor ensures the ongoing observation of the objects and the weather situation (precipitation and temperature) during the winter service period.
- The maximum response time for winter service is 1 hour after the onset of snowfall or icy conditions until the on-site operation.
Westerwald areaTasks and main areas of activity for internal and external traffic areas of the properties, which are part of the contractor's services:
1) Snow removal/removal
-Clearing of snow (black clearance) is required for internal and external traffic areas of the property (this includes, among other things: Underground car park entrance / exit, parking deck driveway / exit, sidewalks, sidewalks, driveways, paths to main, staff and emergency exits, accesses to hydrants).
-The formation of slippery conditions on traffic areas must be prevented and the usability of the areas must be maintained, as well as the drainage of snow water in the event of a thaw.
2) Sprinkle
3) Kontrollfahrten
4) Beobachtungspflicht
-The contractor ensures the ongoing observation of the objects and the weather situation (precipitation and temperature) during the winter service period.
- The maximum response time for winter service is 1 hour after the onset of snowfall or icy conditions until the on-site operation.
Northern/Western Palatinate areaTasks and main areas of activity for internal and external traffic areas of the properties, which are part of the contractor's services:
1) Snow removal/removal
-Clearing of snow (black clearance) is required for internal and external traffic areas of the property (this includes, among other things: Underground car park entrance / exit, parking deck driveway / exit, sidewalks, sidewalks, driveways, paths to main, staff and emergency exits, accesses to hydrants).
-The formation of slippery conditions on traffic areas must be prevented and the usability of the areas must be maintained, as well as the drainage of snow water in the event of a thaw.
2) Sprinkle
3) Kontrollfahrten
4) Beobachtungspflicht
-The contractor ensures the ongoing observation of the objects and the weather situation (precipitation and temperature) during the winter service period.
- The maximum response time for winter service is 1 hour after the onset of snowfall or icy conditions until the on-site operation.
Rheinhessen/Hunsrück-Nahe areaTasks and main areas of activity for internal and external traffic areas of the properties, which are part of the contractor's services:
1) Snow removal/removal
-Clearing of snow (black clearance) is required for internal and external traffic areas of the property (this includes, among other things: Underground car park entrance / exit, parking deck driveway / exit, sidewalks, sidewalks, driveways, paths to main, staff and emergency exits, accesses to hydrants).
-The formation of slippery conditions on traffic areas must be prevented and the usability of the areas must be maintained, as well as the drainage of snow water in the event of a thaw.
2) Sprinkle
3) Kontrollfahrten
4) Beobachtungspflicht
-The contractor ensures the ongoing observation of the objects and the weather situation (precipitation and temperature) during the winter service period.
- The maximum response time for winter service is 1 hour after the onset of snowfall or icy conditions until the on-site operation.
Southern/Anterior Palatinate areaTasks and main areas of activity for internal and external traffic areas of the properties, which are part of the contractor's services:
1) Snow removal/removal
-Clearing of snow (black clearance) is required for internal and external traffic areas of the property (this includes, among other things: Underground car park entrance / exit, parking deck driveway / exit, sidewalks, sidewalks, driveways, paths to main, staff and emergency exits, accesses to hydrants).
-The formation of slippery conditions on traffic areas must be prevented and the usability of the areas must be maintained, as well as the drainage of snow water in the event of a thaw.
2) Sprinkle
3) Kontrollfahrten
4) Beobachtungspflicht
-The contractor ensures the ongoing observation of the objects and the weather situation (precipitation and temperature) during the winter service period.
- The maximum response time for winter service is 1 hour after the onset of snowfall or icy conditions until the on-site operation.
South Eifel areaTasks and main areas of activity for internal and external traffic areas of the properties, which are part of the contractor's services:
1) Snow removal/removal
-Clearing of snow (black clearance) is required for internal and external traffic areas of the property (this includes, among other things: Underground car park entrance / exit, parking deck driveway / exit, sidewalks, sidewalks, driveways, paths to main, staff and emergency exits, accesses to hydrants).
-The formation of slippery conditions on traffic areas must be prevented and the usability of the areas must be maintained, as well as the drainage of snow water in the event of a thaw.
2) Sprinkle
3) Kontrollfahrten
4) Beobachtungspflicht
-The contractor ensures the ongoing observation of the objects and the weather situation (precipitation and temperature) during the winter service period.
- The maximum response time for winter service is 1 hour after the onset of snowfall or icy conditions until the on-site operation.
Saarland areaTasks and main areas of activity for internal and external traffic areas of the properties, which are part of the contractor's services:
1) Snow removal/removal
-Clearing of snow (black clearance) is required for internal and external traffic areas of the property (this includes, among other things: Underground car park entrance / exit, parking deck driveway / exit, sidewalks, sidewalks, driveways, paths to main, staff and emergency exits, accesses to hydrants).
-The formation of slippery conditions on traffic areas must be prevented and the usability of the areas must be maintained, as well as the drainage of snow water in the event of a thaw.
2) Sprinkle
3) Kontrollfahrten
4) Beobachtungspflicht
-The contractor ensures the ongoing observation of the objects and the weather situation (precipitation and temperature) during the winter service period.
- The maximum response time for winter service is 1 hour after the onset of snowfall or icy conditions until the on-site operation.