Sanitary work within buildings
The city of Frankfurt plans the renovation and conversion of a toilet core on level 1 during the 6/22 -8/22 theatre holidays
The planned performance for the sanitary trade includes
- approx. 250 m SML cable as cast iron pipe DN50-DN 150
- approx. 130 m drinking water pipe DN 15 - DN 32
- 28 toilet systems with installation elements
- 17 washbasin systems consisting of a washbasin, cold water tap, accessories
- 3 disabled toilets