Lot 1: Object planning (engineering structures)
Lot 2: Structural engineering
Lot 3: Technical equipment
Lot 4 : Landscape and environmental planning
Project planningSolingen-Wald is home to the Ittertal flood retention basin, which is dominated by the
Bergisch-Rheinischer Wasserverband (BRW) is operated and maintained.
The pool is in need of renovation.
Preliminary planning with the variant evaluation was completed by the end of 2011.
This pre-planning can be used in part (phase 1 can be fully adopted). Corresponding adjustment and modification requirements are contained in the specifications of the tender documents.
Planning for the renovation of HRB Ittertal, Lot 1: Object planning (civil engineering structures)
Level 1: Phases 2-4, various special services
Structural designSolingen-Wald is home to the Ittertal flood retention basin, which is dominated by the
Bergisch-Rheinischer Wasserverband (BRW) is operated and maintained.
The pool is in need of renovation. New engineering structures and excavation pits are to be designed.
Technical equipmentSolingen-Wald is home to the Ittertal flood retention basin, which is dominated by the
Bergisch-Rheinischer Wasserverband (BRW) is operated and maintained.
The pool is in need of renovation. The technical equipment of the HRB is to be planned
Landscape and environmental planningSolingen-Wald is home to the Ittertal flood retention basin, which is dominated by the
Bergisch-Rheinischer Wasserverband (BRW) is operated and maintained.
The pool is in need of renovation. The accompanying landscape conservation plan as well as special services
- General preliminary assessment of environmental impact
- Artenschutzrechtlicher Fachbeitrag
- Mapping of guest and breeding birds
- Mapping of bats
- Mapping the cave trees
- Ecological construction supervision
are to be provided.