Installation vessel for loading, carriage and installation of wind turbines to be available for Contracting Entity's Installation Contractor. Scope includes project management, engineering, provision of sea fastening, vessel mobilisation and demobilisation. Site is Borkum RIffgrund II. Pre-qualification was done through Sellihca.