a) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements, divided into 6 parts, in accordance with the Tables of the location of pedestrian crossings constituting Appendix No. 17 to SWZ,
b) Required quality guarantee period for the Subject of the contract (common for each part of the contract):
- Minimum 24 months,
- Maximum 36 months,
counting from the day following the date of signing the final delivery and acceptance protocol.
c) Deadline for performance and acceptance of the subject of the contract: (common for each part of the contract) 7 months from the date of conclusion of the contract.
PART Ia) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting of, m.in. the construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other elements of road safety - Part I, in accordance with the Tables of the location of pedestrian crossings constituting Annex 17 to SWZ,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ,
- Price tables for the location of pedestrian crossings (applies to Part I of the order) constituting Annex 8 to the SWZ,
- Graphic attachment, constituting Annex 12 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination (common for each part of the contract) constituting Annex 16 to the SWZ,
- Tables of the location of pedestrian crossings (applies to Part I of the order) constituting Annex 17 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2023, item 875). A detailed description of the requirements in this respect is contained in the SWZ (common for each part of the contract),
e) Required quality guarantee period for the Subject of the contract (common for each part of the contract):
- Minimum 24 months,
- Maximum 36 months,
counting from the day following the date of signing the final delivery and acceptance protocol,
f) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
g) Deadline for performance and acceptance of the subject of the contract: (common for each part of the contract) 7 months from the date of conclusion of the contract,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
a) before submitting the bid, the Contractor is obliged to carry out an on-site inspection (common to each part of the contract),
b) failure to carry out an on-site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
PART IIa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting of, m.in. the construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements - Part II, in accordance with the Tables of the location of pedestrian crossings constituting Annex 17 to SWZ,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ,
- Price tables for the location of pedestrian crossings (applies to Part II of the order) constituting Annex 8 to the SWZ,
- Graphic attachment, constituting Annex 12 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination (common for each part of the contract) constituting Annex 16 to the SWZ,
- Tables of the location of pedestrian crossings (applies to Part II of the order) constituting Annex 17 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2023, item 875). A detailed description of the requirements in this respect is contained in the SWZ (common for each part of the contract),
e) Required quality guarantee period for the Subject of the contract (common for each part of the contract):
- Minimum 24 months,
- Maximum 36 months,
counting from the day following the date of signing the final delivery and acceptance protocol,
f) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
g) Deadline for performance and acceptance of the subject of the contract: (common for each part of the contract) 7 months from the date of conclusion of the contract,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
a) before submitting the bid, the Contractor is obliged to carry out an on-site inspection (common to each part of the contract),
b) failure to carry out an on-site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Part IIIa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements - Part III, in accordance with the Tables of pedestrian crossing locations constituting Annex 17 to SWZ,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ,
- Price tables for the location of pedestrian crossings (applies to Part III of the order) constituting Annex 8 to the SWZ,
- Graphic attachment, constituting Annex 12 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination (common for each part of the contract) constituting Annex 16 to the SWZ,
- Tables of the location of pedestrian crossings (applies to Part III of the order) constituting Annex 17 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2023, item 875). A detailed description of the requirements in this respect is contained in the SWZ (common for each part of the contract),
e) Required quality guarantee period for the Subject of the contract (common for each part of the contract):
- Minimum 24 months,
- Maximum 36 months,
counting from the day following the date of signing the final delivery and acceptance protocol,
f) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
g) Deadline for performance and acceptance of the subject of the contract: (common for each part of the contract) 7 months from the date of conclusion of the contract,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
a) before submitting the bid, the Contractor is obliged to carry out an on-site inspection (common to each part of the contract),
b) failure to carry out an on-site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Part IVa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other elements of road safety - Part IV, in accordance with the Tables of the location of pedestrian crossings constituting Annex 17 to SWZ,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ,
- Price tables for the location of pedestrian crossings (applies to Part IV of the order) constituting Annex 8 to the SWZ,
- Graphic attachment, constituting Annex 12 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination (common for each part of the contract) constituting Annex 16 to the SWZ,
- Tables of the location of pedestrian crossings (applies to Part IV of the order) constituting Annex 17 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2023, item 875). A detailed description of the requirements in this respect is contained in the SWZ (common for each part of the contract),
e) Required quality guarantee period for the Subject of the contract (common for each part of the contract):
- Minimum 24 months,
- Maximum 36 months,
counting from the day following the date of signing the final delivery and acceptance protocol,
f) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
g) Deadline for performance and acceptance of the subject of the contract: (common for each part of the contract) 7 months from the date of conclusion of the contract,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
a) before submitting the bid, the Contractor is obliged to carry out an on-site inspection (common to each part of the contract),
b) failure to carry out an on-site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Part Va) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting of, m.in. the construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other elements of road safety - Part V, in accordance with the Tables of the location of pedestrian crossings constituting Annex 17 to SWZ,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ,
- Price tables for the location of pedestrian crossings (applies to Part V of the order) constituting Annex 8 to the SWZ,
- Graphic attachment, constituting Annex 12 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination (common for each part of the contract) constituting Annex 16 to the SWZ,
- Tables of the location of pedestrian crossings (applies to Part V of the order) constituting Annex 17 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2023, item 875). A detailed description of the requirements in this respect is contained in the SWZ (common for each part of the contract),
e) Required quality guarantee period for the Subject of the contract (common for each part of the contract):
- Minimum 24 months,
- Maximum 36 months,
counting from the day following the date of signing the final delivery and acceptance protocol,
f) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
g) Deadline for performance and acceptance of the subject of the contract: (common for each part of the contract) 7 months from the date of conclusion of the contract,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
a) before submitting the bid, the Contractor is obliged to carry out an on-site inspection (common to each part of the contract),
b) failure to carry out an on-site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Part VIa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other elements of road safety - Part VI, in accordance with the Tables of the location of pedestrian crossings constituting Annex 17 to SWZ,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ,
- Price tables for the location of pedestrian crossings (applies to Part VI of the order) constituting Annex 8 to the SWZ,
- Graphic attachment, constituting Annex 12 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination (common for each part of the contract) constituting Annex 16 to the SWZ,
- Tables of the location of pedestrian crossings (applies to Part VI of the order) constituting Annex 17 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2023, item 875). A detailed description of the requirements in this respect is contained in the SWZ (common for each part of the contract),
e) Required quality guarantee period for the Subject of the contract (common for each part of the contract):
- Minimum 24 months,
- Maximum 36 months,
counting from the day following the date of signing the final delivery and acceptance protocol,
f) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
g) Deadline for performance and acceptance of the subject of the contract: (common for each part of the contract) 7 months from the date of conclusion of the contract,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
a) before submitting the bid, the Contractor is obliged to carry out an on-site inspection (common to each part of the contract),
b) failure to carry out an on-site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.