Solar energy | Tenderlake

Solar energy

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
14 June 2019
Closing Date:
13 December 2019
Location(s):
FR FRANCE
Description:
Invitation to tender for the construction and operation of solar power generation facilities located in non-interconnected areas

The tender project focused on the construction and operation of solar power generation facilities located in non-interconnected areas. The installations are divided into families thus defined:

Family 1: facilities coupling production and storage:

- 1a: installations on buildings and parking shades of power between 100 and 500 kWp,

- 1b: installations on buildings and parking shades of power strictly greater than 500 kWp and less than or equal to 1.5 MWp,

- 1c: ground installations with power exceeding 500 kWp and not exceeding 5 MWp.

Family 2: Installations not equipped with storage device:

- 2a: installations on buildings and parking shades of power between 100 and 500 kWp,

- 2b: installations on buildings and parking shades of power strictly greater than 500 kWp and less than or equal to 1.5 MWp,

- 2c: ST power ground installations.

For the 1 re application period, the cumulative power requested for family 1 is distributed by territory and by sub-family of application according to the following distribution:

- Corsica (F1a = 1 MW), (F1b = 1 MW) and (F1c = 1 MW),

- Guadeloupe (F1a = 3 MW), (F1b = 5 MW) and (F1c = 7 MW),

- Guyana (F1a = 1 MW), (F1b = 1 MW) and (F1c = 1 MW),

Réunion (F1a = 2 MW), (F1b = 5 MW) and (F1c = 5 MW),

- Martinique (F1a = 3 MW), (F1b = 4 MW) and (F1c = 1 MW),

- Mayotte (F1a = 2 MW), (F1b = 3 MW) and (F1c = 5 MW).

For the 3 e application period, the cumulative power requested for family 1 is distributed by territory and by sub-family of application according to the following distribution:

- Corsica (F1a = 1 MW), (F1b = 2 MW) and (F1c = 2 MW),

- Guadeloupe (F1a = 5 MW), (F1b = 10 MW) and (F1c = 10 MW),

- Guyana (F1a = 2 MW), (F1b = 2 MW) and (F1c = 1 MW),

- Réunion (F1a = 5 MW), (F1b = 5 MW) and (F1c = 10 MW),

- Martinique (F1a = 5 MW), (F1b = 5 MW) and (F1c = 2 MW),

- Mayotte (F1a = 5 MW), (F1b = 7 MW) and (F1c = 10 MW).

Called volumes by period for family 2:

For the 2 e application period, the cumulative power called for the family 2 is distributed by territory and by sub-family of application according to the following distribution:

- Corsica (F2a = 1 MW) and (F2b = 2 MW),

- Guadeloupe (F2a = 1 MW), (F2b = 2 MW) and (F2c = 1 MW),

- Guyana (F2a = 2 MW), (F2b = 2 MW) and (F2c = 6 MW),

Réunion (F2a = 4 MW), (F2b = 6 MW) and (F2c = 10 MW),

- Martinique (F2a = 4 MW), (F2b = 6 MW) and (F2c = 10 MW),

- Mayotte (F2a = 1 MW) and (F2b = 1 MW).

For the 4 e application period, the cumulative power called for the family 2 is distributed by territory and by sub-family of application according to the following distribution:

- Corsica (F2a = 1 MW) and (F2b = 2 MW),

- Guadeloupe (F2a = 2 MW), (F2b = 3 MW) and (F2c = 3 MW),

- Guyana (F2a = 3 MW), (F2b = 4 MW) and (F2c = 7 MW),

- Réunion (F2a = 5 MW), (F2b = 10 MW) and (F2c = 17 MW),

- Martinique (F2a = 5 MW), (F2b = 7 MW) and (F2c = 12 MW),

- Mayotte (F2a = 1 MW) and (F2b = 1 MW).

Download full details as .pdf
The Buyer:
Ministère de l'écologie, du développement durable et de l'énergie
CPV Code(s):
09330000 - Solar energy