Studies, construction and on-site assembly of all biological protection for the corridors of the PDRC zone of the Jules Horowitz Reactor (RJH).
the market is broken down as follows:
- Fixed firm share:
_Poste 0: Manufacture of additional turntables
_Poste 1: PRO and EXE studies
_Poste 2: Phase A – Cabinets, Doors, Flues, Circulation Platforms for the CED-1 and CED-2 Levels and Operating Equipment
_Poste 3: Phase B - Biological protection such as removable slabs for CEDE-1 and CED-2 flues
- Optional flat-rate share (Item 4: Biological protection and circulation platform PDRC -3)
- Estimated share on flat-rate unit price schedule (BPU): Storage of CEDE-1 slabs; PDRC-2; PD3
- Estimated share on prior estimate.
The Market is broken down as follows:
- Fixed firm share:
• Item 0: Manufacture of additional plates for CEDE-1, CEDE -2, CEDE -3 cabinets;
• Position 1: Studies;
• Sub-item 1.1: Execution studies of traffic platforms;
• Sub-item 1.2: Execution studies of operating tools.
• Item 2: Phase A – Cabinets, doors, flues, circulation platforms for the CED-1 and CEDE-2 levels and operating equipment;
• Sub-item 2.1: Supplies;
• Sub-item 2.2: REAL factory;
• Sub-item 2.3: On-site assembly.
• Item 3: Phase B – Biological protection such as removable slabs for the CED-1 and CEDE-2 flues;
• Sub-item 3.1: Supplies;
• Sub-item 3.2: REAL factory;
• Sub-item 3.3: On-site assembly.
- Optional part:
• Item 4: CED-3 level biological protection;
• Sub-item 4.1: CEDE-3 ProBio Supplies;
• Sub-item 4.2: REAL CEDE-3 plant;
• Sub-item 4.3: On-site assembly CEDE-3.
- Estimated share on flat-rate unit price schedule (BPU):
• Storage CEDE-1 tiles;
• CEDE-2 tile storage;
• Storage CEDE-3 tiles.
- Estimated share on prior estimate.