The contractor's service includes the complete measuring, control and regulation system for the technical building equipment, essentially consisting of:
- approx. 4 central switch cabinets (ISP),
- approx. 500 data points,
- approx. 14 damper actuators,
- approx. 7 control valves,
- approx. 3 290 m plastic sheathed cable,
- approx. 8,000 m of low-voltage cable,
- approx. 135 m sheet steel cable tray,
- approx. 330 wiring + connection work.
s. II 1.4).