Electrical installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 June 2021
Closing Date:
27 July 2021
Location(s):
LU00 Luxembourg (LU LUXEMBOURG)
Description:
Electrical installation works

— a dry transformer of 300 kVA;

— a 20 kVA inverter (eight NoBreak electrical cabinets: one main panel, seven divisional panels), 1,632 m of cable and accessories;

— a counting table, comprising four main meters;

— fifteen electrical cabinets (one TGBT, three distribution boards and eleven secondary);

— wiring assembly consisting of 17,538 m of cables, 540 m of empty tubes, 1,043 m of tracks/cable ladders and floor housings;

— a set of equipment consisting of 459 control and force elements;

— complete passive computer network consisting of rack, sockets and wiring;

— wiring for smoke removal stairs, video parlophony, two charging stations;

— emergency lighting consisting of 239 modules and 7,108 m of cables;

— various installations (KNX; lighting; DI consisting of a power station, a subplant and 290 detectors/sirens; video surveillance; access control; intrusion; temporary).

Electrical works to be carried out in the interest of the transformation and renovation of the new SNCI headquarters, 2 Boulevard Emmanuel Servais, L-2535 Luxembourg including:

— a dry transformer of 300 kVA;

— a 20 kVA inverter (eight NoBreak electrical cabinets: one main panel, seven divisional panels), 1,632 m of cable and accessories;

— a counting table, comprising four main meters;

— fifteen electrical cabinets (one TGBT, three distribution boards and eleven secondary);

— wiring assembly consisting of 17,538 m of cables, 540 m of empty tubes, 1,043 m of tracks/cable ladders and floor housings;

— a set of equipment consisting of 459 control and force elements;

— complete passive computer network consisting of rack, sockets and wiring;

— wiring for smoke removal stairs, video parlophony, two charging stations;

— emergency lighting consisting of 239 modules and 7,108 m of cables;

— various installations (KNX; lighting; DI consisting of a power station, a subplant and 290 detectors/sirens; video surveillance; access control; intrusion; temporary).

The work is awarded in block at unit prices. The duration of the work is 240 working days to begin in January 2022.

Download full details as .pdf
The Buyer:
Société nationale de crédit et d’investissement (SNCI)
CPV Code(s):
45310000 - Electrical installation work