the works include: the creation on the R+3 of 2 male dormitories of 40 beds each (i.e. 80 beds) and 2 studios (including 1 PMR), the creation on the R+2 of a girls dormitory with 30 beds and 2 studios (including 1 PMR), the thermal improvement of the building (insulation of the facades by the outside, the replacement of all the exterior joinery, replacement of the the entire heating installation (radiators and distribution), restoration of the ventilation of the building), compliance with fire safety standards and accessibility
earthworks - Vrdthe works include the realization of: - platform for site installation- trenches for electrical networks- takeover of the Eu/Ef/Ep network (replacement of deteriorated buffers) - creation of PMR access ramps to the building- peripheral strip in gravel
Soft floor coveringsthe works include the realization of: - rubber floor for the rooms and circulations of the dormitories
Suspended ceilingsthe works include the realization of: - suspended ceilings 600 x 600 for circulations and sanitary facilities of the dormitories
Elevatorthe works include the realization of: - lift of 625 kg, or 8 people
ELECTRICITYthe work includes the realization of: - replacement of the general electrical panel of the building and the divisional boards located on each level - complete recovery of electricity on levels 2 and 3 (excluding existing housing) - fire detection will be brought up to standard following the new configuration of the premises - bringing the VDI installation up to standards - replacement of TGBT
Sanitary Plumbingthe works include the realization of: - replacement of hot and cold water distribution- sanitary equipment of dormitories and studios- ECs Infirmary and housing: electric water heater- ECs Studios: electric water heater (individual) - ECs Boarding school: small plate exchangers on the primary heating network as close as possible to the water points
heating - ventilation - smokethe works include the realization of: - relocation of the existing substation- replacement of the heating distribution and radiators- Self-adjusting single-flow vMC with intermittent operation for boarding schools and studios (on clock) - Individual hygro-adjustable single flow vMC with permanent operation for the dwellings- VMC double flow for one-eyed households
ASBESTOS - CONSTRUCTIONthe works include the realization of: - asbestos removal floor slabs and glue, earthenware (all levels of the areas concerned) - cleaning after asbestos removal of levels 2 and 3 (floors, walls, ceilings), except existing housing- removal and deconstruction work (floors, walls and partitions, ceilings) - demolition of the 2 external stairs- removal of the whole exterior carpentry
Structural Work - Sealantthe work includes the realization of: - creation and clogging of openings in walls and floors- realization of an elevator shaft- recovery of the waterproofing in the right of the elevator door- creation of smoke outlet
aluminium wood exterior joinery - Blackoutsthe works include the realization of: - supply and installation of aluminum wood exterior joinery (with electric aluminum shutters) for the entire building
cladding - exterior insulationthe works include the realization of: - repair of reinforced concrete facades - wood-framed wall (foamglas; rock wool for the other levels; siding (metal cladding +fiber cement panels)) - pre-lacquered steel bay surrounds
Metalwork - Locksmithingthe works include the realization of: - steel jointed assemblies for the entrance doors
wood interior joinery - signage - fire extinguishersthe works include the realization of: - supply and installation of solid core door blocks, laminated finish- glazed frames- prefabricated laminate partitioning for showers and sanitary- acoustic ceilings made of wood (fireplaces) - interior signage- furniture for the bedrooms (headboards, cabinets, worktops, shelves)
plasterery - partitions - dubbing - Peinturethe works include the realization of: - distribution partitions in plasterboard on frame with mineral wool- lining with plasterboard on frame with mineral wool- suspended ceilings in plasterboard (rooms and studios) - painting on all the walls and partitioning of the project- painting on ceilings of rooms, studios and stairwells
hard coatingthe works include the realization of: - screed with cement mortar- liquid waterproofing system under tiles on the floor and walls of showers and collective sanitary facilities- tiling on the floor in showers and sanitary facilities- full height earthenware in showers and toilets