Road bridge construction work | Tenderlake

Road bridge construction work

Contract Value:
EUR 7M - 7M
Notice Type:
Contract Notice
Published Date:
07 March 2023
Closing Date:
20 April 2023
Location(s):
DEA12 Duisburg, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Replacement of Östricher Bridge No. 417, WDK-km 23,887

Replacement of Östricher Bridge No. 417, WDK-km 23,887

The replacement takes place about 300m further west via the Wesel-Dattel-Kanal (WDK) and is located in Dorsten Östrich. The municipal roads "Kanalweg" and "Brückenweg" are connected.

The replacement takes place about 300m further west via the Wesel-Dattel-Kanal (WDK) and is located in Dorsten Östrich. The municipal roads "Kanalweg" and "Brückenweg" are connected.

The superstructure is planned as a rectangular steel bar arch bridge with an external main structure, with straight hangers. The bar arch bridge is designed without upper wind bracing.

The abutments are founded by means of bored piles (six per wither) with a diameter of 1.20 m deep. The foundation level of the individual bored piles varies in height.

Download full details as .pdf
The Buyer:
Wasserstraßen- und Schifffahrtsamt Westdeutsche Kanäle
CPV Code(s):
45221111 - Road bridge construction work