Replacement of Östricher Bridge No. 417, WDK-km 23,887
The replacement takes place about 300m further west via the Wesel-Dattel-Kanal (WDK) and is located in Dorsten Östrich. The municipal roads "Kanalweg" and "Brückenweg" are connected.
The replacement takes place about 300m further west via the Wesel-Dattel-Kanal (WDK) and is located in Dorsten Östrich. The municipal roads "Kanalweg" and "Brückenweg" are connected.
The superstructure is planned as a rectangular steel bar arch bridge with an external main structure, with straight hangers. The bar arch bridge is designed without upper wind bracing.
The abutments are founded by means of bored piles (six per wither) with a diameter of 1.20 m deep. The foundation level of the individual bored piles varies in height.