Installation of heating and cooling supply for a research building
Transfer station cold water 6/12°C 1800 kW
Transfer station hot water HT 75/45 °C 1900 kW
Transfer station hot water NT 35/25 °C 1900 kW
Approx. 3000m steel pipe welded
Approx. 1500m stainless steel pipe pressed
Approx. 60m buried pipeline DN200 to DN400
6 cold rooms, water-cooled condensers