The aim of the award procedure is the awarding of engineering services for the technical equipment, equipment groups 1-3 and 6-8, LPH 7 (partial) and LPH 8 + 9 according to HOAI § 55, for the construction of a new workshop and laboratory building of HS Kaiserslautern.
Chargeable costs (net) acc. Cost calculation for the 2nd HU construction:
1.1.1) sewage, water and gas installations 1 043 487.00 EUR;
1.1.2) heat supply systems 2 037 174,00 EUR;
1.1.3) Ventilation systems 4 436 366.00 EUR;
1.1.6) Conveyors 673 820.00 EUR;
1.1.7) (1) Fire extinguishing systems 142 395.00 EUR;
1.1.7) (2) Media Supply Facilities 225 742.00 EUR;
1.1.7) (3) Laboratory equipment 764 076,00 EUR;
1.1.7) (4) process heat, cooling, air systems 280 174,00 EUR;
1.1.7) (5) Disposal facilities 22 516,00 EUR;
1.1.7) (9) climatic chamber 78 000.00 EUR;
1.1.8) Building automation 1 409 200.00 EUR.
Total 11 112 950.00 EUR
HOAI § 53, HOAI § 55, LPH 7 (partial) and LPH 8 + 9 for the new construction of a workshop and laboratory building of the University of Kaiserslautern.
ALG 1:
- roof drainage as a high pressure system, separation system, rainwater downpipes and
- collecting lines,
- waste water pipes, laboratory sewage system, lifting equipment,
- Drinking water system for sanitary objects, tea kitchens, eye showers, emergency showers.
Stagnation free with system flushing device,
- decentralized domestic hot water production,
- Operating water system for laboratory areas, pressure booster system,
- gas installation for laboratory supply,
- sanitary facilities, sanitary facilities barrier-free, emergency showers,
- insulation work on technical equipment,
- Control tasks, measured value acquisition and processing by means of DDC (GA).
ALG 2:
- 2 pieces heat generator 400 kW as water / water heat pump, dual (325 kW cooling capacity), storage tank 4 000 l,
- heat distribution network with heating circuit distributors for BTA, DSP, radiators,
- BTA and DSP as changeover system for heating / cooling operation,
- BTA system in ceilings of the EC, 1st floor and 2nd floor, control of freely programmable DDC,
- DSP in multi-storey rooms and the mall, room temperature controlled.
Free programmable DDC
- radiator with thermostatic valves,
- heat metering devices, pressure maintenance systems, safety devices,
- Connection groups of air heaters in HVAC systems,
- insulation work on technical equipment,
- Control tasks, measured value acquisition and processing by means of DDC (GA).
ALG 3:
- RLT central units as air conditioning and partial air conditioning systems, exhausts for special exhaust air.
Safety Cabinets Ventilators / RLT equipment for technical rooms, RLT equipment for supplying laboratories, test benches, combustion air Engine and chassis dynamometer.
Total about 35 plants
- AU towers, grounded AU line,
- air duct system in the building as a duct or pipe,
- Exhaust air system for special exhaust air, laboratory exhaust air, plastic fume hoods PPS,
- fire dampers, volumetric flow controllers,
- Refrigeration systems for HVAC systems, IT and process refrigeration, cooling load 1 400 kW,
- 2 water / water heat pumps, dual (each 325 kW cooling capacity),
- use of water from "Lauterwasserkanal" (third order water), 3 heat exchangers per 250 kW,
- recooling plants, adiabat roof installation,
- insulation work on technical equipment,
- Control tasks, measured value acquisition and processing by means of DDC (GA).
ALG 6:
- 2 passenger lifts EN 81-70,
- 6 crane systems, single-girder overhead crane.
ALG 7.1
- Fire water supply system 1988-600, wall hydrants DIN 14461-1, fire water tank 18 m
ALG 7.2
- Compressed air generation 2 piston compressor systems, 8.8 m
- High purity gas supply.
ALG 7.3
- Laboratory fume cupboards, technical fume cupboards, safety cabinets, laboratory workstations, sinks, medical cells, point extractors.
ALG 7.4
- Cooling system engine test bench / car test bench 560 kW, cooling fuel conditioning system, circulating air cooling system,
- exhaust extraction system.
ALG 7.5
- Chip extraction system
ALG 7.8
- Climate chamber, refrigeration aggregate, ultrasonic humidifier.
ALG 8
- Automation level from ISP with DDC substations (BACnet), VBE, integration in MBE, consumption recording M-BUS, field level.
The award of the construction work is carried out as a single contract award.