erection of containers, including foundations; Preparation of verifiable statics, proof of fire resistance, interior fittings (drywall, electrical work, heating and plumbing), operation of the residential complex.
Installation time or an operation of at least 5 years is planned. A total service life of 5 years from the start of use with two extension options of 1 year each. Finally, the entire building, including foundations, must be dismantled and
to be removed.
The facility is planned for approximately 218 residents. The usable area is approx. 1,804 m² on the ground floor and 1,795 m² on the upper floor.
erection of containers, including foundations; Preparation of verifiable statics, proof of fire resistance, interior fittings (drywall, electrical work, heating and plumbing), operation of the residential complex.
Installation time or an operation of at least 5 years is planned, with extension options (twice for another year).
The facility is planned for approximately 218 residents. The usable area is approx. 1,804 m² on the ground floor and 1,795 m² on the upper floor.