Remaining planning and construction of an NGA network together with house connections with house connection management in Au, Auggen, Ebringen, Merzhausen, Müllheim, Neuchâtel, Pfaffenweiler, Schallstadt, Wittnau
Los 1 - AuThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself.
The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The client plans to build an NGA network (FTTB) within part of the municipal area of the Verbandsgemeinde of Au. The aim is to eliminate any white spots that are still present there. The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 29.03.2021 for the project is attached in the attachment preliminary funding decision of 29.03.2021. Overall, investments totalling around EUR 880,808.15 net are planned for the expansion of the NGA network (FTTB). Explanations and specifications of the funding or project sponsor regarding the material concept must be observed.
Investments of around EUR 484,000.00 net are planned for the expansion of the backbone.
Planning status Au
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
-New route (paved surface): 2,420 m
- Shafts: 3 pcs.
Local network
Federal Broadband Funding e-file number: 823.5/3-2009BW200628
The current planning status corresponds to a design planning based on the existing structural planning. A total of approx. 21 FTTB house connections are planned. The project comprises:
- New route (paved surface): 1,880 m
- New route (unpaved surface): 497 m
- FTTB distributors (enclosures and/or shafts): 6 pieces
- POP prefabricated buildings and/or cabinets: 1 piece
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status will be communicated accordingly with the request to submit an offer in the next procedural step.
Lot 2 - AuggenThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself. The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The contracting authority plans to build an NGA network (FTTB) within part of the municipal area of the Verbandsgemeinde of Auggen. The aim is to eliminate any white spots that are still present there. The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 29.03.2021 for the project is attached in the attachment preliminary funding decision of 29.03.2021. Overall, investments totalling around 3,999,709.66 net are planned for the expansion of the NGA network (FTTB). Explanations and specifications of the funding or project sponsor regarding the material concept must be observed.
Investments of around EUR 1,179,400.00 net are planned for the backbone.
Planning status Auggen
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
- New route (paved surface): 3,823 m
- New route (unpaved surface): 2,074 m
- Cable retraction into existing conduit: 497 m
- Shafts: 5 pcs.
Local network
Federal Broadband Funding e-file number: 823.5/3-2009BW200629
The current planning status corresponds to a design planning based on the existing structural planning. A total of approx. 79 FTTB house connections are planned. The project comprises:
- New route (paved surface): 10.739m
- Cable entry into existing conduit: 1,071 m
- FTTB distributors (cabinets and/or shafts): 16 pieces
- POP prefabricated buildings and/or cabinets: 2 pieces
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status is communicated accordingly with the invitation to tender in the next step of the procedure.
Lot 3 - EbringenThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself.
The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The contracting authority plans to build an NGA network (FTTB) within part of the boundaries of the Verbandsgemeinde of Ebringen. The aim is to eliminate any white spots that are still present there.
The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 26.07.2021 for the project is attached to the provisional funding decision of 26.07.2021. Overall, investments totalling around EUR 2,618,038.56 net are planned for the expansion of the NGA network (FTTB).
The specifications and specifications of the funding or project promoter regarding the material concept must be observed.
Investments of around EUR 976,000.00 net are planned for the backbone.
Planning status Ebringen
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
- New route (paved surface): 3,507 m
- New route (unpaved surface): 1,373 m
- Shafts: 5 pcs.
Local network
Federal Broadband Funding e-file number: 823.5/3-2009BW200635
The current planning status corresponds to a design planning based on the existing structural planning. A total of approx. 36 FTTB house connections are planned. The project comprises:
- New route (paved surface): 7,223 m
- FTTB distributors (cabinets and/or bays): 17 pieces
- POP prefabricated buildings and/or cabinets: 1 piece
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status will be communicated accordingly with the request to submit an offer in the next procedural step.
Lot 4 - MerzhausenThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself.
The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The contracting authority plans to build an NGA network (FTTB) within part of the municipal area of the Verbandsgemeinde of Merzhausen. The aim is to eliminate any white spots that are still present there.
The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 23.08.2021 for the project is attached in the attachment preliminary funding decision of 23.08.2021. Overall, investments totalling around EUR 1,268,465.23 net are planned for the expansion of the NGA network (FTTB).
The specifications and specifications of the funding or project promoter regarding the material concept must be observed.
Investments of around EUR 66,400.00 net are planned for the backbone.
Planning status Merzhausen
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
- New route (paved surface): 332 m
- Cable entry into existing conduit: 1,460 m
- Shafts: 1 pc.
Local network
Federal Broadband Funding e-file number: 823.5/3-2009BW200633
The current planning status corresponds to a design planning based on the existing structural planning. A total of approx. 37 FTTB house connections are planned. The project comprises:
- New route (paved surface): 2,825 m
- FTTB distributors (cabinets and/or bays): 9 pieces
- POP prefabricated buildings and/or cabinets: 1 piece
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status will be communicated accordingly with the request to submit an offer in the next procedural step.
Lot 5 - MüllheimThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself.
The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The client plans to build an NGA network (FTTB) within part of the municipal area of the Verbandsgemeinde of Müllheim. The aim is to eliminate any white spots that are still present there.
The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 21.06.2021 for the project is attached in the attachment preliminary funding decision of 21.06.2021. Overall, investments totalling around EUR 4,425,884.42 net are planned for the expansion of the NGA network (FTTB).
The specifications and specifications of the funding or project promoter regarding the material concept must be observed.
Investments of around EUR 2,622,400.00 net are planned for the backbone.
Planning status Müllheim
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
- New route (paved surface): 8,406 m
- New route (unpaved surface): 4,706 m
- Cable entry into existing conduit: 6,650 m
- Shafts: 19 pcs.
Local network
Federal Broadband Funding e-file number: 832.5/3-2109BW200707
The current planning status corresponds to a design planning based on the existing structural planning. A total of approx. 175FTTB house connections are planned. The project comprises:
- New route (paved surface): 10,052 m
- FTTB distributors (cabinets and/or bays): 17 pieces
- POP prefabricated buildings and/or cabinets: 4 pieces
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status will be communicated accordingly with the request to submit an offer in the next procedural step.
Lot 6 - NeuchâtelThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself.
The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The contracting authority plans to build an NGA network (FTTB) within part of the municipal area of the Verbandsgemeinde of Neuchâtel. The aim is to eliminate any white spots that are still present there.
The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 12.04.2021 for the project is attached in the attachment preliminary funding decision of 12.04.2021. Overall, investments totalling around EUR 11,931,985.15 net are planned for the expansion of the NGA network (FTTB).
The specifications and specifications of the funding or project promoter regarding the material concept must be observed.
Investments of around EUR 2,087,800.00 net are planned for the expansion of the backbone.
Planning status Neuchâtel
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
- New route (paved surface): 4,002 m
- New route (unpaved surface): 6,437 m
- Cable entry into existing conduit: 10,995 m
- Shafts: 15 pcs.
Local network
Federal Broadband Funding e-file number: 832.5/3-2009BW200609
The current planning status corresponds to a design planning based on the existing structural planning. A total of approx. 449 FTTB house connections are planned. The project comprises:
- New route (paved surface): 27,526 m
- New route (unpaved surface): 4,093 m
- Cable entry into existing conduit: 15,667 m
FTTB distributors (cabinets and/or bays): 44 pieces
POP prefabricated buildings and/or cabinets: 6 pieces
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status will be communicated accordingly with the request to submit an offer in the next procedural step.
Lot 7 - PfaffenweilerThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself.
The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The client plans to build an NGA network (FTTB) within part of the municipal area of the Verbandsgemeinde of Pfaffenweiler. The aim is to eliminate any white spots that are still present there.
The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 02.08.2021 for the project is attached in the attachment preliminary funding decision of 02.08.2021. Overall, investments totalling around EUR 830,726.41 net are planned for the expansion of the NGA network (FTTB).
The specifications and specifications of the funding or project promoter regarding the material concept must be observed.
Investments of around EUR 1,078,000.00 net are planned for the expansion of the backbone.
Planning status Pfaffenweiler
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
- New route (paved surface): 3,125 m
- New route (unpaved surface): 2,265 m
- Bays: 6 pcs
Local network
Federal Broadband Funding e-file number: 823.5/3-2009BW200634
The current planning status corresponds to a design planning based on the existing structural planning. A total of approx. 25 FTTB house connections are planned. The project comprises:
- New route (paved surface): 1,731 m
- FTTB distributors (cabinets and/or shafts): 5 pieces
- POP prefabricated buildings and/or cabinets: 1 piece
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status will be communicated accordingly with the request to submit an offer in the next procedural step.
Lot 8 - SchallstadtThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself.
The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The client plans to build an NGA network (FTTB) within part of the municipal area of Schallstadt. The aim is to eliminate any white spots that are still present there.
The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 26.04.2021 for the project is attached in the attachment preliminary funding decision of 26.04.2021. Overall, investments totalling around EUR 1,725,182.83 net are planned for the expansion of the NGA network (FTTB).
The specifications and specifications of the funding or project promoter regarding the material concept must be observed.
Investments of around EUR 2,578,600.00 net are planned for the expansion of the backbone.
Planning status Schallstadt
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
- New route (paved surface): 7,872 m
- New route (unpaved surface): 5,021 m
- Shafts: 12 pcs.
Local network
Federal Broadband Funding e-file number: 823.5/3-2109BW200696
The current planning status corresponds to a design planning based on the existing structural planning. A total of approx. 57 FTTB house connections are planned. The project comprises:
- New route (paved surface): 4,034 m
- FTTB distributors (cabinets and/or bays): 8 pieces
- POP prefabricated buildings and/or cabinets: 2 pieces
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status will be communicated accordingly with the request to submit an offer in the next procedural step.
Lot 9 - WittnauThe Zweckverband Breitband Breisgau-Hochschwarzwald (client) comprises 40 cities and municipalities in the district of Breisgau-Hochschwarzwald as well as the district of Breisgau-Hochschwarzwald itself.
The task of the special-purpose association is to ensure an expansion with fiber optics for underserved households and commercial enterprises in the association area.
In the context of a previous Europe-wide tender, an operator for subsequent grid operation was identified via the special-purpose association. Vodafone GmbH, which has been selected as the network operator, will operate the client's planned network for expansion.
The client plans to build an NGA network (FTTB) within part of the boundaries of the Verbandsgemeinde of Wittnau. The aim is to eliminate any white spots that are still present there.
The project is to be funded according to the guideline "Funding to support broadband expansion in the Federal Republic of Germany" as well as according to the administrative regulation of the Ministry of the Interior for co-financing the funding from the guideline for the support of broadband expansion in the Federal Republic of Germany (VwV broadband co-financing) and VWV broadband funding. The preliminary funding decision of 08.02.2021 for the project is attached in the attachment preliminary funding decision of 08.02.2021. Overall, investments totalling around EUR 684,936.56 net are planned for the expansion of the NGA network (FTTB).
The specifications and specifications of the funding or project promoter regarding the material concept must be observed.
Investments of around EUR 1,200,000.00 net are planned for the expansion of the backbone.
Planning status Wittnau
The listed route lengths can be reduced or shifted due to co-laying that has been coordinated in the meantime.
Backbone
State Broadband Funding File number: will be submitted later
- New route (paved surface): 3,893 m
- New route (unpaved surface): 2,107 m
- Shafts: 6 pcs.
Local network
Federal funding broadband e-file number: 823.5/3-2009BW200632
The current planning status corresponds to a draft plan based on the existing structural plan. A total of around 9 FTTB house connections are planned. The project includes:
- New route (paved surface): 1,700 m
- New route (unpaved surface): 402 m
- FTTB distributors (cabinets and/or bays): 3 pieces
- POP prefabricated buildings and/or cabinets: 1 piece
Furthermore, the eligible drivage based on reserve capacities and the connection of paths of adjacent light grey spots (excluding tunnelling addresses) via the grey spots upgrade are planned. Further strategic-functional connections in the context of the upgrade grey spots are reserved.
The planning status will be communicated accordingly with the request to submit an offer in the next procedural step.