This consultation consists of a firm and two optional bands. It deals with the diagnosis of the Béziers collection system in order to confirm preliminary studies of the sanitation master plan and the management of a storage basin. The estimated financial envelope allocated to the work amounts to: EUR 26 760 000 excluding VAT.
Project management team will need to have the following skills:
— hydrology;
— free-surface hydraulics (1D, 2D and 3D modeling);
- civil engineering;
- electromechanical;
— metrology and supervision
— roads and various networks;
— regulatory records and environmental studies;
— operating control (impact on the operating contract);
— legal and public procurement.
Details of the mission elements entrusted to the contractor: DIAG/AVP/PRO/AMT/VISA/DET/AOR and twelve additional missions.
This consultation consists of a firm and two optional bands. It deals with the diagnosis of the Béziers collection system in order to confirm preliminary studies of the sanitation master plan and the management of a storage basin. The estimated financial envelope allocated to the work amounts to: EUR 26 760 000 excluding VAT.
Project management team will need to have the following skills:
— hydrology;
— free-surface hydraulics (1D, 2D and 3D modeling);
- civil engineering;
- electromechanical;
— metrology and supervision
— roads and various networks;
— regulatory records and environmental studies;
— operating control (impact on the operating contract);
— legal and public procurement.
Details of the mission elements entrusted to the contractor: DIAG/AVP/PRO/AMT/VISA/DET/AOR and twelve additional missions.