the consultation concerns the Technical Inspection Mission for the energy and technical renovation works of 7 colleges. The task of the technical controller relates to the works part of the design/implementation phase of the overall performance market; estimated at 34 526 666 euros (s) excl. VAT or 41 431,999.20 euro (s) (including tax), broken down as follows: Firm tranche: 29,166666 euro (s) HT-Optional tranche no1- rehabilitation of science rooms: 850,000 euro (s) excluding optional tranche no2- refurbishment of half pensions of certain colleges: 1,670,000 euro (s) HTOptional tranche no3- repair of sports facilities at certain colleges: 1,000,000 euro (s) HTOptional tranche no4- replacement of heating distribution networks: 1,840,000 euro (s) (Excl. Tax).
the consultation concerns the Technical Inspection Mission for the energy and technical renovation works of 7 colleges. The task of the technical controller relates to the works part of the design/implementation phase of the overall performance market; estimated at 34 526 666 euros (s) excl. VAT or 41 431,999.20 euro (s) (including tax), broken down as follows: Firm tranche: 29,166666 euro (s) HT-Optional tranche no1- rehabilitation of science rooms: 850,000 euro (s) excluding optional tranche no2- refurbishment of half pensions of certain colleges: 1,670,000 euro (s) HTOptional tranche no3- repair of sports facilities at certain colleges: 1,000,000 euro (s) HTOptional tranche no4- replacement of heating distribution networks: 1,840,000 euro (s) (Excl. Tax).