4-storey extension to existing hospital as main measure
and conversion measures in the existing ground floor up to 3rd floor -
as well as preliminary measures with construction of external stairs and emergency exits
and interim relocation of the existing main entrance
4 pcs fire curtain EW-90-S200-C2, W=2.76m, H=2.70m to 3.13m
6.5 m² interior darkening with side guide rails in aluminium H=2.05m