The project includes about 5500 m of new water pipe between Vieryd and Kullåkra in Ronneby municipality, On about 1800 m of the stretch, between Lilla kulleryd and Kullåkra, a pressure wastewater pipeline will also be located parallel to the water pipe.
The work will mainly be carried out using trenchless methods.
The project includes about 5500 m of new water pipe between Vieryd and Kullåkra in Ronneby municipality, On about 1800 m of the stretch, between Lilla kulleryd and Kullåkra, a pressure wastewater pipeline will also be located parallel to the water pipe.
The work will mainly be carried out using trenchless methods.