Execution of ventilation and refrigeration work at the Braunenberg Education Campus (BCB) in Aalen-Wasseralfingen
Execution of ventilation and refrigeration work at the Braunenberg Education Campus (BCB) in Aalen-Wasseralfingen Reassembly of:
Ventilation units incl. control (MSR) (approx. 10,500 m3/h) approx. 1 pcs.;
Ventilation units incl. control (MSR) (approx. 650 m3/h) approx. 1 pcs.;
Kitchen exhaust fan incl. control (approx. 1,800m³/h) approx. 1 pcs.;
Kleinventilatoren ca. 100 m³/h ca. 9 St.;
Ventilation ducts and fittings + insulation approx. 430 m²;
Ventilation duct as round pipe + fittings + insulation approx. 340 m;
Volume flow controller and limiter approx. 75 pcs.;
Brandschutzklappen ca. 16 St.;
Air conditioning unit cascade for ventilation unit approx. 45kW approx. 1 pcs.;
Air conditioners for server room approx. 7kW approx. 1 pcs.;
Refrigerant line + insulation approx. 110 m