- Supply and installation of sheet steel doors with and without fire safety requirements.
- Supply and installation of double-leaf door systems.
-repair of a folding door system, replacement of glass panes.
A written request for the documents is to be avoided.
These are only available digitally and free of charge via www.subreport.de/e79554896! ATTENTION! We recommend that you download the tender documents only after registration. If the tender documents are downloaded without registration, there is no automatic information about changes or bidding requests. Obtaining information about changes is then the sole responsibility of the respective bidder!
Offers or requests to participate are to be submitted electronically via the function "Request for participation / submit offer" via: www.subreport.de
All further information is available at: http://www.ladadi.de/ausschaltungen
- Supply and installation of sheet steel doors with and without fire safety requirements.
- Supply and installation of double-leaf door systems.
-repair of a folding door system, replacement of glass panes.
Execution time: 14.03.2022-03.04.2023
Contractual penalties (§ 11 VOB / B)
If the specified individual deadlines or the deadline for completion are exceeded, the contractor must pay as a contractual penalty for each working day of the delay: 0.15 percent. H. the order amount stated in the order letter excluding sales tax; Amounts for offered maintenance services are not taken into account. The reference value for calculating the contractual penalty when individual deadlines agreed as a contractual period are exceeded is the part of this order amount that corresponds to the services to be contractually provided up to this point in time. The contractual penalty is increased to a total of 5 percent. H. of the order amount stated in the order letter (excluding sales tax).