ARGO operates Roskilde CHP plant, which utilizes waste for energy (heat and electricity) via 2 furnace lines.
The two furnace lines extract the energy in 24 hours of operation in just a few weeks per day. years when the furnace lines are switched down due to planned shutdowns. During these very short closure periods, ARGO audits the 2 furnace lines for which sand blasting is used 24 hours, as described in this tender.
In addition to the audit periods, ad hoc tasks may occur, e.g. blasting, tasks at unplanned stops or scheduled stops due to operating conditions.
Click here https://permalink.mercell.com/121461122.aspx
ARGO operates Roskilde CHP plant, which utilizes waste for energy (heat and electricity) via 2 furnace lines.
The two furnace lines extract the energy in 24 hours of operation in just a few weeks per day. years when the furnace lines are switched down due to planned shutdowns. During these very short closure periods, ARGO audits the 2 furnace lines for which sand blasting is used 24 hours, as described in this tender.
In addition to the audit periods, ad hoc tasks may occur, e.g. blasting, tasks at unplanned stops or scheduled stops where operations require it.