Construction work for electricity power lines | Tenderlake

Construction work for electricity power lines

Contract Value:
EUR 45M - 45M
Notice Type:
Contract Notice
Published Date:
27 November 2019
Closing Date:
08 January 2020
Location(s):
FRI21 Corrèze (FR FRANCE)
Description:
Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of HTA / Bt transformer stations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformer stations, the resumption or repair of existing connections, the removal of abandoned works, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Authorities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformer stations, the resumption or repair of existing connections, the removal of abandoned works, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Authorities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformation substations, the resumption or repair of existing connections, the removal of abandoned structures, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Collectivities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformer stations, the resumption or repair of existing connections, the removal of abandoned works, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Authorities, the resumption of public lighting installations according to the instructions of the contracting authority.


Execution studies and works on rural electrification and telecommunication networks for the period 2020-2022

The operation consists of carrying out studies and works for extensions and reinforcements of medium voltage (HTA) and low voltage (BTA) electrical distribution networks, HTA and BTA power line concealments, the construction of MV / LV transformer stations, the resumption or repair of existing connections, the removal of abandoned works, the coordinated concealment of telecommunications networks in accordance with Article L. 2224-35 of the General Code of Territorial Authorities, the resumption of public lighting installations according to the instructions of the contracting authority.

Download full details as .pdf
The Buyer:
FDEE19
CPV Code(s):
45231400 - Construction work for electricity power lines
45232200 - Ancillary works for electricity power lines
45315500 - Medium-voltage installation work
45315600 - Low-voltage installation work