Delivery and installation of the heat supply system with approx. 4,000 m of steel pipe DN12-DN50, 1 main distribution and 3 subdistributions, including pumps, fittings and accessories. Domestic hot water is produced via fresh water stations. Double boiler system (about 1 MW) available, of which 1 boiler is renewed with about 500 kW. Expected implementation: March 2019 to June 2021
Delivery and installation of the heat supply system with approx. 4,000 m of steel pipe DN12-DN50, 1 main distribution and 3 subdistributions, including pumps, fittings and accessories. Domestic hot water is produced via fresh water stations. Double boiler system (about 1 MW) available, of which 1 boiler is renewed with about 500 kW.