Execution of complete power, lighting and information technology systems in the new construction of the 4-storey functional wing and in the conversion areas of the existing buildings.
- 1 St. BSV- 230V system,
- approx. 85,000 m of cables and lines,
- approx. 6,500 m of cables and cables with E90 / E30 functional integrity,
- approx. 62,000 m of cables and wires for information technology,
- approx. 30 pc final distributions,
- approx. 19 switching devices 4-pin / 2-pin,
- approx. 23 St. isolating transformers,
- approx. 2,600 switching and consumption devices,
- approx. 200 m cable support systems with attachment for flame treatment 30 min / partially with E-90 cladding,
- approx. 120 pieces of fire protection insulation with fire resistance class S30 / S90,
- about 1,200 lights,
- approx. 23 hours medical care units for the recovery area / IMC,
- approx. 8 St. Ceiling-hung supply units for intensive care,
- TK-Zentrale extension by approx. 35 participants,
- nurse call system for approx. 110 functional rooms,
- Clock system with approx. 55 slave clocks,
- Fire alarm panel for approx. 480 detectors,
- about 10 pcs. Computer data cabinets,
- approx. 900 pc EDP switching and consumption devices.