Electrical fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 May 2022
Closing Date:
13 June 2022
Location(s):
DE21G Mühldorf a. Inn (DE Germany/DEUTSCHLAND)
Description:
Extension (of a school building) Mittelschule Mühldorf a. Inn Elektroarbeiten

Extension of the secondary school Mühldorf a. Inn

the new building complements the existing school building with two further full storeys

Gross volume: 8.867m³

Floor area: 7.179m²

Electrical installations

ca. 650m Hauptleitungen

ca. 850m Verlegesysteme

ca. 250m Unterflurkanalsystem

4 pcs. electrical sub-distributor with knX fittings

15 st. installation columns for classrooms

approx. 25,000m line network of high-voltage power plants

approx. 600 switching, control and plug-in devices

ca. 250St. LED- Einbaudownlights

approx. 260lfm continuous row LED profile luminaires

approx. 390 emergency warning/safety lights

1 hour emergency lighting centre with sub-centres

1 St. ELA/SAA headquarters

approx. 7,500m low-voltage line network

approx. 100 fire alarm field devices with extension of existing fire alarm panel

approx. 90 Pcs. ELA/SAA loudspeakers

approx. 20 secondary clocks with clock centre

1 St. Lichtrufanlage

approx. 500m fiber optic cable

approx. 7,500m data duplex line with data distributor

approx. 10 outdoor luminaires

Download full details as .pdf
The Buyer:
Stadt Mühldorf a. Inn
CPV Code(s):
45311200 - Electrical fitting work