Renovation of traffic facilities, combined sewer and drinking water pipeline as well as new construction of rainwater sewer and district heating pipeline
Part 1 (HRO): Road construction
- 6.600 m3 Bodenarbeiten
- 4.210 m2 Asphaltflächen
- 130 m2 concrete ceiling
- 660 m2 vorh. Natural stone paving bonded, re-laid
- 500 m2 of small pavement bound
- 2,325 m2 concrete paving/slabs with bishop's cap
- 1,080 m gully from vorh. Stone
- 1,000 m vorh. Resetting natural stone shelves
- 875 m borders/knee belt railings
- 1,160 m empty conduit in accordance with DiGiNetz law
- 20 pcs installation of new street lights
Part 2 (North Water):
Drinking water:
- 310 m dismantling of TW pipeline DN 100 - 300,
- 345 m backfilling TW pipeline 150 AZ,
- 665 m renewal of TW pipeline DN 100 - 300 PE & GGG
- 45 m Rohreinzug TWL da 50 x 4,6 PE in vorh. TWL DN 100 AZ
- 2 excavation pits for relining measures
- 21 pcs. connection TW house connection line
Mixed water:
- 10 pcs. dismantling MW shaft DN 1000–1500 B
- 705 m dismantling MW sewer DN 300 - 650 B
- 705 m new construction pl. MW sewer DN 300 - 600 in cut-and-cover construction
- 15 pcs. new building pl. MW shaft DN 1000 PC
- 6 pcs. new building pl. MW shaft DN 1200 - 1500 pcs
- 1 piece of unification and crash structure made of polymer concrete
- 32 pcs. Renewal of MW connection line DN 50–250 in cut-and-cover construction
- 8 pcs. rehabilitation of MW connection pipe DN 50–250 by pipe lining
Rainwater:
- 620 m new building pl. NSW sewer DN 600 - 1200 GRP in cut-and-cover construction
- 62 m new building pl. NSW sewer DN 300 - 400 B in cut-and-cover construction
- 14 pcs. new building pl. NSW shaft DN 1200 - 1600 GRP
- 1 new building pl. NSW fall shaft DN 2000 GRP
- 4 pcs. new building pl. NSW shaft DN 1000 B
- 40 St. Neubau NSW-Grundstücksanschlüsse DN 150 PVC
Part 3 (SWR AG): District heating
- 120 m KMR 50/125
- 350 m KMR 65/140
- 220 m KMR 80/160