The subject of the contract is the successive collection (including transport) and management of waste from the municipal wastewater treatment plant located in Cieszyn at 27 Motokrosowa Street. disposal, including pre-recovery preparation (e.g. waste hygienization code 19 08 05, if necessary) or disposal, respectively applied to individual waste types.
Transport of waste, detailed in point 3, will be carried out from the Sewage Treatment Plant in Cieszyn located in Cieszyn at 27 Motokrosowa Street by vehicles equipped with GPS equipment.
The task includes waste:
(a) stabilised municipal sewage sludge code 19 08 05 in an indicative amount of up to 26 tonnes per day (on working days) — that is approximately 520 tonnes of sewage sludge per month,
(b) scales code 19 08 01 in an indicative amount of up to 1.5 tonnes of scraps per week — that is approximately 6 tonnes of scraps per month,
(c) the content of sandpipers code 19 08 02 in indicative quantity up to 7 tonnes per month.
The above quantities are taken indicatively on the basis of the quantities recorded by the Contracting Authority in the previous years. Actual values may differ slightly from the above and will result from the current needs of the Ordering Party, subject to factors independent of the Contracting Authority, which may affect changes in the amount of waste produced by the Contracting Authority.