Details of the tasks entrusted to the incumbent are contained in the specifications. The work consists of:
— asbestos removal, deconstruction, demolition of old and poorly adapted buildings (about 700 m
— light restructuring (about 700 m
— heavy restructuring college and Greta (about 2,000 m
— new construction (approx. 2,300 m
— rehabilitation outdoor spaces (approximately 5,500 m
— structural and thermal rehabilitation (envelope, networks);
— implementation of PMR standards;
— possible installation of prefabricated structures during the work forecast estimate of the work: 9 700 000 EUR excl.
As an indication, the studies have a planned duration of 12 months and the work has a planned duration of 36 months.
Details of the tasks entrusted to the incumbent are contained in the specifications. The work consists of:
— asbestos removal, deconstruction, demolition of old and poorly adapted buildings (about 700 m
— light restructuring (about 700 m
— heavy restructuring college and Greta (about 2,000 m
— new construction (approx. 2,300 m
— rehabilitation outdoor spaces (approx. 5,500 m
— structural and thermal rehabilitation (envelope, networks),
— implementation of PMR standards,
— possible installation of prefabricated structures during the work forecast estimate of the work: 9 700 000 EUR excl.
As an indication, the studies have a planned duration of 12 months and the work has a planned duration of 36 months.