The subject of the order is the delivery and installation of 11 pcs of photovoltaic installations in the territory of the municipality of Rypin and the city of Rypin (Municipality Office building), including, inter alia: the supply and installation of 11 pcs of photovoltaic installations with a total peak power of 323,38 kWp, according to the table: placed in SWZ.
3. The object of the order is the delivery and installation of 11 pcs of solar installations in the territory of the municipality of Rypin and the town of Rypin (Municipality Office building), including, inter alia:
1) supply and assembly of 11 pcs of photovoltaic installations with a total peak power of 323,38 kWp, according to the table in the SWZ;
2) installation of support structures of photovoltaic modules;
3) installation of photovoltaic panels on the structure;
4) installation of solar wiring between modules and inverter;
5) making the main installation for connecting the inverter to the main switchboard of the building;
6) installation of the RDC DC DC circuit switchgear;
7) assembly of the inverter;
8) installation of RAC switchgear switchgear switchgear;
9) the performance of anti-shock protection;
10) the performance of surge protection;
11) trials, measurements, adjustment and technological start-up of the plant;
12) the execution of abbreviated post-construction documentation for each project participant and full post-construction documentation for the Ordering Party (certificates, guarantees, instructions for operation, implementation projects, set of electrical measurements, set of documents for altering the meter, documentation received from Ordering Party with red-colored corrections);
13. Connection to the PGE Distribution S.A. network together with the preparation of a set of documents and confirmation of the installation notification to the network — scans of accepted applications for the network;
14) training Users in the proper operation of the installations performed;
15) drawing up service instructions containing the necessary information on how to proceed in the event of unexpected errors in the installation;
16) program and launch of the installation;
17) supplement possible cavities of walls, ceilings, sealing the roofing material after the passages of the wires;
18) other elements included in the technical specification provided with the design documentation (Annex 8 to SWZ).