EWB_Erweiterungsneubau 50m indoor swimming pool Wiesenbad Eschborn

Brief description of procurement: EWB_ARC 04_Rohbauarbeiten

Betonarbeiten (DIN 18 331); Erdarbeiten (SINCE 18300); Mauerarbeiten (DIN 18 330); Stahlbauarbeiten (DIN 18 335); Abdichtungsarbeiten (DIN 18 336); Entwässerungskanalarbeiten (DIN 18 306);

The city of Eschborn intends to build a new extension with a 50 m swimming pool for the Wiesenbad in Eschborn. In September 2018, the city council approved the planning of the additional swimming pool submitted by the city council by a majority. Eight 50-metre-long lanes will be built as well as a separate entrance hall for the new extension. The swimming pool will have a flexible lifting floor. In addition, the indoor swimming pool will be equipped with sliding doors, which can be opened to the outdoor pool in summer. The gross costs for this measure amount to around € 15.7 million. Access to the site is via the existing access roads from the main road. The work will take place while the swimming pool is in operation.

Brief description of procurement: EWB_ARC 04_Rohbauarbeiten

Site equipment:

1,00 St Construction site equipment

1.00 pcs power connection for crane

1,00 Psch construction crane

12,00 StMt Construction crane available

100,00 m Umwehrungen Deckenöffnungen

930,00 mMt Enclosure

earthworks:

3296,50 m³ earthworks / filling sand / excavation pit

44.20 m³ earthworks / excavated soil / strip foundations / frost aprons

162.50 m³ earthworks ABW / small-volume excavation / pipe trench

128.70 m³ earthworks ABW / medium-volume excavation / pipe trench

130.00 m³ earthworks ABW / large-volume excavation / pipe trench

130.00 m pipe trench for heating and drinking water pipes

218,00 m³ earthworks / loosening soil for excavation pit, BK 3-4,

218.00 m³ earthworks / filling sand / excavation pit

32.55 m³ earthworks / excavated soil / strip foundations / frost aprons

Basic lines:

325,00 m Rohr DN 100

67,00 m Rohr DN 150

65,00 m Rohr DN 200

260,00 St Bogen DN 100

25,00 St Bodenablauf DN 100

Concrete work:

2997,70 m² Sauberkeitsschicht / 5 cm

2997,70 m² insulation and floor / perimeter insulation d = 100 mm

1453,50 m² Insulation on walls / perimeter insulation d=100 mm

2997.70 m² PE film / 2-layer / 0.5 mm

4,00 pcs single foundation / C30/37 /300x300x60 cm / XC2 WF

41.00 m in-situ concrete strip foundations / C25/30 / wxh 170/60 cm/ XC2

430,70 m² Sohlplatte/ d= 50cm / C25/30,/ WU / XC2 WF / OKRS -3,44 m

663,80 m² Sohlplatte/ d= 50cm / C25/30,/ WU / XC2 WF / OKRS -4,37 m

722,00 m² Sohlplatte/ d= 35,5cm / C25/30,/ WU / XC2 WF / OKRS -2,025 m

362,20 m² Sohlplatte/ d= 30 cm / C25/30,/ WU / XC2 WF / OKRS -3,44 m

337,87 m² Sohlplatte/ d= 35cm / C25/30,/ XC2 WF / OKRS -0,12 m

2329,90 m² Sohlplatte/ C25/30 / WU / XC2 WF / Flügelgeglättet

748.90 m joint protection / sole-wall

224.50 m joint protection / wall-to-wall

64,00 pcs Joint protection / sole-wall / corner fittings

289,70 m² Sauberkeitsschicht / 5 cm

289.70 m² insulation and floor / perimeter insulation d= 100 mm

61.20 m² insulation on walls / perimeter insulation d=100 mm

3,00 pcs single foundation / C30/37 /170x170x60 cm / XC2 WF

6,00 pcs single foundation / C30/37 /180x120x60cm/ XC2 WF

289,70 m² Sohlplatte/ d= 25cm / C25/30,/ XC2 WF / OKRS -0,12 m

1450,00 m Fundamenterder V4A

930,00 m Fundamenterder

328.94 m² in-situ concrete walls / exterior / 30 cm / up to 4.00m /C25/30 WU / XC2 WO

357.93 m² in-situ concrete walls / exterior / 30 cm / up to 3.10 m /C25/30 WU / XC2 WO

31.30 m² in-situ concrete walls / exterior / 30 cm / up to 1.65 m /C25/30 WU / XC2 WO

106.81 m² in-situ concrete walls / external / 25 cm / up to 4.20 m /C25/30 WU / XC2 WO

17.28 m² in-situ concrete walls / exterior / 25 cm / up to 2.90 m /C25/30 WU / XC2 WO

89.76 m² in-situ concrete walls / interior / 30 cm / up to 2.40 m /C25/30 WU / XC2 WO

56.08 m² in-situ concrete walls / interior / 30 cm / up to 3.10 m /C25/30 WU / XC2 WO

65.72 m² in-situ concrete walls / interior / 30 cm / up to 4.00 m /C25/30 / XC2 WO

53.68 m² in-situ concrete walls / interior / 25 cm / up to 4.00 m /C25/30 / XC2 WO

46.93 m² in-situ concrete walls / interior / 25 cm / up to 3.10 m /C25/30 / XC2 WO

52.00 m Supports IW / 30x30cm /4.00 m / XC3WO / C25/30

36.00 m Supports IW / 25x25cm /4.00 m / XC3WO / C25/30

52.70 m supports IW / 25x25cm /3.10 m / XC3WO / C25/30

774.00 m² in-situ concrete walls / exterior / 30 cm / up to 9.20 m /C25/30 / XC3 WO

137.76 m² in-situ concrete walls / interior / 20 cm / up to 9.20 m /C25/30 / XC3WO

77.03 m² in-situ concrete walls / interior / 30 cm / up to 3.65 m /C25/30 / XC3WO

35.99 m² in-situ concrete walls / interior / 30 cm / up to 5.05 m /C25/30 / XC3WO

56,65 m Supports AW / 30x30cm /5,15m / XC3WO / C25/30

51.10 m supports IW / 30x30cm /3.65m / XC3WO / C25/30

22.90 m² in-situ concrete walls / external/ 30 cm / up to 5.05 m /C25/30 / XC3WO

20.20 m supports AW / 30x30cm /5.05 m / XC3WO / C25/30

30.30 m supports IW / 30x30cm /5.05 m / XC3WO / C25/30

299.40 m² in-situ concrete walls / exterior / 30 cm / up to 5.30 m /C25/30 / XC3WO

104.90 m² in-situ concrete walls / external / 30 cm / up to 5.65 m /C25/30 / XC3WO

17.00 m² in-situ concrete walls inside / 20 cm / up to 5.00m /C25/30 / XC3 WO

31.00 m² in-situ concrete walls inside / 20 cm / up to 3.65 m /C25/30 / XC3 WO

117.70 m² ceiling / C25/30 / h= 20 cm / XC3 WO / ABS= 3.65 m

437.30 m² ceiling / C25/30 / h= 25 cm / XC3 WO / ABS= 4.00 m

324.00 m² ceiling / C25/30 / h= 25 cm / XC3 WO / ABS= 3.10 m

208.10 m² ceiling / C25/30 / h= 30 cm / XC3 WO / ABS= 3.95 m

43.50 m² ceiling / C25/30 / h= 35 cm / XC3 WO / ABS= 3.00 m

86,90 m Stb.-Ringbalken / b/h 24/55 cm, C25/30 / XC3WO

86.90 m Attic / w/h 24/39 cm, C25/30 / XC3WO

279.50 m² ceiling / C25/30/ h= 28 cm / XC3WO/ ABS= 5.05 m

31,10 m Stb.-Unterzug b/hr 30/100 cm, C25/30 / XC3WO

40,70 m Stb.-Unterzug b/h 30/91 cm, C25/30 / XC3WO

26,60 m Stb.-Unterzug b/hr 30/75 cm, C25/30 / XC3WO

67.30 m Stb.-Attic / w/h 24/32 cm, C25/30 / XC3WO

28.00 m² ceiling / C25/30/ h= 20 cm / XC3WO/ ABS= 3.45 m

10,50 m Stb.-Unterzug b/h 25/35 cm, C25/30 / XC3WO

19.20 m Attic / w/h 24/32 cm, C25/30 / XC3WO

1,00 pcs stairs / C25/30 / h= 20 cm / 20 pcs 18x27 cm / 2 legs + intermediate platform

47,00 to Structural steel BSt 500 SA, MA,

376,00 to Baustahl BSt 500 SA, S, D=6-12 mm

9,00 to structural steel BSt 500 SA, MA, D=14-20 mm

114.00 pcs Ceiling connection existing

50.00 m² formwork, various smooth.

10.00 m³ concrete C 25/30

5,00 pcs Fibre cement casing pipe, DN 200

5,00 pcs Fibre cement casing pipe, DN 150

8,00 pcs Fibre cement casing pipe, DN 100

45.00 m slots / up to 10 x 10 cm (WxD)

45.00 m slots / up to 20 x 10 cm (WxD)

35.00 m slots / up to 35 x 10 cm (WxD)

60,00 m Kaberlschutzrohr DN 160

1.00 psch monitoring concrete pavement, class 2

1.00 psch planning components made of WU concrete

Masonry work:

110,00 m2 indoor MW / 17,5 cm / KSL-12-1,4-IIa

38.00 m masonry connection / F90 / ceiling

217,53 m² Aussen-MW / 24,0 cm / KSL-20-2,0-IIa

60.00 m² indoor MW / 24.0 cm / KSL-20-2.0-IIa

178.45 m² indoor MW / 24.0 cm / KSL-12-1.4-IIa

173.34 m² indoor MW / 17.5 cm / KSL-12-1.4-IIa

636.39 m² indoor MW / 11.5 cm / KSL-12-1.4-IIa

60,00 pcs Wall openings < 0,1 m²

50,00 pcs Wall openings < 0.5 m²

101.09 m² indoor MW / 17.5 cm / KSL-12-1.4-IIa

111.71 m² indoor MW / 11.5 cm / KSL-12-1.4-IIa

Download full details as .pdf
The Buyer:
Magistrat der Stadt Eschborn
CPV Code(s):
45212212 - Construction work for swimming pool